Warehouse Loading Bays
BRIEF
Securifab were approached by a construction firm working on a government backed project with extremely tight deadlines. 27 concrete loading bays needed to be constructed for housing hydraulic dock leveling equipment, the existing method of constructing and removing wooden shuttering was adding excess time onto the job and a faster solution was required.
DESIGN
Our CAD team quickly designed a prefabricated shuttering system ensuring it had the required strength to withstand the pressure from the many tons of poured concrete. The client approved the design and the laser profiling set in motion.
OUTCOME
Our Skilled fabricators worked efficiently to manufacture all 27 shuttering’s in a short lead time. They were then transported from our workshop and lifted straight into location. This fast turnaround helped the client complete the required work ahead of schedule.
UPLOAD YOUR DRAWING
Get In Touch
For a fast quote, please upload your drawing(s) detailing your requirements and one of our team will contact you shortly to discuss your project.
Alternatively, please contact us using the contact details below and one of our team will assist you further.